Installation

Turbine Up!Assembled and ReadyFoundation pourA very interested young bystanderBlade and hub assemblyExcavation at the Montana State University siteTower SectionsFinal leveling and bolt torqueThe LiftMET 480 "Alternative Energy Applications" class members assembling the tower bolt kitFinishing the foundation concrete with MET 480 Alternative Energy class membersAssembling the 5-piece towerGin pole installedBlade Installation

Click on an image to view as a slideshow.

Maintenance

 

Click on an image to view as a slideshow.

Skystream 3.7

Click on an image to view as a slideshow.